Small light tower general telescopic rod operation, is in how to operate, here is the three steps we summarize.Small light towers lamp will have a telescopic rod, this telescopic rod is used for folding operation, lamp height, direction, etc., general telescopic rod operation.
The first step: lift the telescopic rod inspection work :
According to the lighting requirements, adjust the lamp holder irradiation Angle; Four lamp holders can be horizontal 360°; Adjust the irradiation Angle within the range of 180° up and down. Remove the retaining pin from the front of the body. Check that there are no obstructions within 13 meters of the top of the small light tower. Check the good condition of the wire rope; Check all fastening pins and bolts for secure locking.
The second step, set up the telescopic rod :
Open the operation panel of the carriage and rotate/reverse the transfer switch on the operation control panel. Press the red dot switch, lifting rod dot stand up; When held down for 3 seconds, the lifting rod starts the long dynamic state, and the lifting rod stands up continuously. When the lifting rod is completely upright, press the red button again to turn off the motor; Then insert the fixing pin at the front of the carriage into the lifting rod and fix it.
The third step is to raise the small light towers telescopic rod :
Turn the transfer switch on the operation control panel to the "lift" position. Press the red dot switch, lifting rod dot rise; When held down for 3 seconds, the lifting rod starts the long dynamic state, and the lifting rod stands up continuously. According to the lighting needs to determine the lifting height of the telescopic rod, press the red button again, turn off the motor; The lifting rod stops rising; The maximum lifting height of the lifting rod is 10 meters.








